The city water sample came back clean. Tap water is ok to drink.
Category: Well
Well #1 Repair – 7/12/22
The new pump failed with 5 sheared fins.
Pump Fins
Well Maintenance – 7/11/22
Well #1 has stopped producing water. The new pump and motor are still operating, but there is no flow.
Brian Cushman is coming out to pull the well on a warranty repair, and set the pump lower if needed.
Well Maintenance – May, 2022
Flow Meter
to be installed
Bootster Pumps Before
Check-valve & Air-gap
Finished Products
Well Maintenance Scheduled
Tuesday May 31st, 2022 @ 10:00am – 2:00pm
- Flow Meter Installation
- Booster Pump Check-valve Replacement
- Booster Pump Air-gap Replacement
Water Shutoff 5/31/22
Water will be shut off to the city on May 31st, 2022 from 10:00am to approx. 2:00pm to install a new flow meter and to replace check-valves on each booster pump.
Well #1 Service
Friday, May 27th, 2022, Pump and Motor pulled
Saturday, May 28th, 2022, Pump and Motor replaced