Water will be shut off to the city on May 31st, 2022 from 10:00am to approx. 2:00pm to install a new flow meter and to replace check-valves on each booster pump.
Water will be shut off to the city on May 31st, 2022 from 10:00am to approx. 2:00pm to install a new flow meter and to replace check-valves on each booster pump.